It's been an interesting week, I've gone from being in control to being out of control and then back in control all with in a few days of each other. However finally we have our trenches finished ready for the plumbing install and then concreting. The demolition company that I used did a shonk job, they failed to remove a sizable piece of concrete approx 400mm below the top surface. Fingers crossed it will be OK as only the kitchen sink drain sits right on top of this area, if it needs to be removed it will cost me $$ and the builder time which we both can't afford. Other than that the job of soil removal and trenching has gone quite well, once the contractors made contact with each other it all went smoothly. Now I just have to pray that it does not rain to heavily this week prior to the concrete pore.